
- This event has passed.
(Install) CIGI
September 21, 2016
Techs:
Leo C *
Dan D *
Schedule:
Shop Call: 9:00am
Onsite: 9:30am
Done By: 3:00pm
Vehicle:
P.V.
Quote:
Notes:
Note for the call. Only run cable through conduits Doug requests. Doug will terminate. Must replace pull string in conduit. Doug supplies required cabling.
Sherwood provides pull string / zip ties etc.